Virtual Public Hearing for US 377 Improvements

Thursday, November 19, 2020

United States Highway (US) 377
From North of BUS US377E to US 380
Denton County, Texas
CSJ: 0081-06-040
November 19, 2020

 

The proposed project consists of the reconstruction and widening of approximately 13.7 miles of US 377 from North of BUS 377E in Pilot Point to US 380 in Cross Roads, TX. Improvements would include the expansion of the current 2-lane rural roadway to a 6-lane urban roadway with a raised median to provide additional capacity and improve safety. Improvements would consist of 12-foot-wide travel lanes, 14-foot-wide outside shared-use lanes, and 5-foot sidewalks with Americans with Disabilities Act (ADA) curb ramps in both directions through most of the project. Proposed drainage would be conveyed by curb & gutter, a storm sewer system and crossing culverts. Other improvements would include realigning the intersections of BUS 377 S at US 377, and FM 424 at US 377. The existing right of way (ROW) width would increase with the proposed project to 140 feet. The proposed project is anticipated to require 54.7 acres of additional ROW and 1.1 acres of proposed permanent drainage easements.

The virtual hearing will be held beginning on Nov. 19, 2020 at 6 p.m. and the presentation will remain available for viewing until Friday, Dec. 4, 2020 at 11:59 p.m. During this time, please view the video presentation and exhibits provided on this site to learn about the project, and provide your comments.

PRESENTATION

Click on the image or the link below to view the narrated video presentation. 

Presentation Link: https://www.youtube.com/watch?v=Q7YgEihBDpQ&feature=youtu.be

EXHIBITS

You may click on any of the project exhibits below to view them at full size. 

PROJECT SCHEMATIC

Key map and schematic
Roll 1 North of E Burk St to North of BUS 377E
Roll 2 North of S Harrision St to North of E Burk St
Roll 3 South of S Washington St to North of S Harrison St
Roll 4 South of FM 455E to South of Washington St
Roll 5 South of Belew Rd to South of FM 455E
Roll 6 South of FM 3524 to South of Belew Rd
Roll 7 South of Black Jack Rd to South of FM 3524
Roll 8 Stanley St to South of Black Jack Rd
Roll 9 South of Fairview Dr to South of Stanley St
Roll 10 Liberty Rd to South of Fairview Dr
Roll 11 North of Fishtrap Rd to Liberty Rd
Roll 12 US 380 to North of Fish Trap Rd
Rolls 13-15 Intersecting Street Profile

DRAFT ENVIRONMNETAL DOCUMENT & TECHNICAL REPORTS

Please click on the links below to view the Draft Environmental Assessment & Technical Reports

Draft Environmental Assessment
Combined Tech Reports

RIGHT-OF-WAY (ROW) INFORMATION

If you would like to familiarize yourself with the process for state purchase of ROW and relocation assistance, please click on the below link:

https://www.txdot.gov/inside-txdot/forms-publications/publications/landowner-rights.html

HOW TO PROVIDE COMMENTS

The deadline for providing comments is Friday, December 4, 2020.

Comments may be provided by voicemail, email, or mail, as explained below.

Verbal Testimony:

Leave a recorded voicemail with your verbal testimony starting on Tuesday, November 19, 2020, at 6:00 p.m.; you can leave a voicemail at any time until 11:59 p.m. on Friday, December 4, 2020:
Phone: (469) 333-0439

Online Submittal

https://www.surveymonkey.com/r/us377-denton

Written Comments:

Deadline: Submit written comments on or before Friday, December 4, 2020:
Provide Comments Via:
Email: [email protected]
Mail:   TxDOT Dallas District Office
Attention Nelson Underwood, P.E.
4777 East US Highway 80
Mesquite, TX 75150-6643

The PDF Comment Form may be completed on the computer or printed and handwritten, and can be submitted by email or mail. Click the links below for the PDF Comment Form.

PDF Comment Form English
PDF Comment Form Spanish

QUESTIONS?

Contact the TxDOT project manager, Nelson Underwood, P.E., to ask questions about the project at [email protected] or (214) 320-6628.