Virtual Public Meeting for US 80 (from FM 460 to Spur 557) and Spur 557 (from US 80 to I-20)
Kaufman County
CSJs 0095-03-106, 0095-04-076, and 0495-01-081
Thursday, July 28, 2022
The virtual meeting begins on Thursday, July 28, 2022 at 5:30 PM and will remain available online through the comment period deadline of Friday August 12, 2022. During this time, please view the project materials and other information provided on this site to learn about the project and provide your comments.
PROJECT DESCRIPTION
Proposed improvements consist of reconstructing US 80 from FM 460 to Spur 557 from a four-lane divided to a six-lane divided highway with auxiliary lanes and a concrete barrier along the centerline. Proposed improvements along Spur 557 also consist of reconstructing Spur 557 from a four-lane divided to a six-lane divided highway with auxiliary lanes and a concrete barrier along the median. Both US 80 and Spur 557’s proposed improvements would include adding continuous two to three-lane, one-way frontage roads in each direction along the proposed project to fill existing frontage road gaps and to remove existing two-way frontage roads. Ramping improvements, bridge reconstruction, shared use paths and sidewalks are proposed for both US 80 and Spur 557.
PRESENTATION
TxDOT EXHIBITS
You may click on any of the project exhibits below to view them at full size
SCHEMATIC
RIGHT OF WAY (ROW) INFORMATION
The proposed improvements would potentially require new ROW.
Information about the process for state purchase of ROW and relocation assistance may be found in the following pamphlets: {use hyperlinks below}
Relocation Assistance: English
Relocation Assistance: Spanish
State Purchase of ROW: English
State Purchase of ROW: Spanish
HOW TO PROVIDE COMMENTS
The deadline for providing comments is August 12, 2022.
QUESTIONS?
Contact the TxDOT project manager Jonathan Stowe, P.E. to ask questions about the project at [email protected] or (214) 320-6158.