PROJECT DESCRIPTION
The proposed I-345 Connects project between I-30 and Woodall Rodgers Freeway would depress and reconstruct I-345 to include three 12-foot-wide mainlanes in each direction with city street connections over the top. Discontinuous frontage roads would be constructed along the highway between Bryan Street and Hall Street to I-30. The project would include 10-foot-wide sidewalks along cross streets and six-foot-wide sidewalks along the frontage road. Additional cross/side streets would be realigned and reconstructed.
PRESENTATION
March 19, 2024 Presentation Recording
March 21, 2024 Presentation Recording
FUTURE I-345 CONNECTS
View a simulation of the proposed I-345 Connects project
To view station materials, click on the bulleted items
STATION 1: WELCOME
At this station, you can:
- View a project location map
- Learn about TxDOT’s End the Streak campaign
- Watch the I-345 flyover video for aerial perspectives of the existing highway
STATION 2: PROJECT OVERVIEW
At this station, you can:
- View the Study Goals from the 2016 CityMap report which were carried forward into the I-345 Feasibility Study
- View the I-345 Feasibility Study goals (completed in 2022) and how public input was considered in the current project design
- Review solutions to problems identified in the Feasibility Study
- Review the I-345 Connects schematic and environmental phase timeline
- Review the I-345 Connects overall timeline to understand next steps
- See answers to frequently asked questions
STATION 3: ENVIRONMENTAL
At this station, you can:
- Learn about the Environmental Assessment being conducted
- View the environmental constraints map which helps planners and engineers avoid or mitigate potential impacts to the natural and human environment
- Learn about the National Environmental Policy Act (NEPA) Assignment to TxDOT
STATION 4: PROJECT DESIGN
At this station, you can:
- Learn about changes made to the project design since the Feasibility Study
- View a typical section exhibit of the mainlanes
- Get an introduction to the design of the city cross streets
- View renderings of potential pedestrian and bicycle accommodations and amenities on the city street grid
- See how each city street typical section could change from what exists today
- View the project schematic
- To view an interactive schematic map, click HERE
STATION 5: SURPLUS RIGHT OF WAY AND CAPPING OPPORTUNITIES
At this station, you can:
- View a map with potential surplus right of way and possible land use
- View a map with potential capping areas
STATION 6: ACCESS CHANGES
At this station, you can:
- See how local access will change with the I-345 Connects project
- Southbound access to Deep Ellum and Baylor Scott & White Hospital Complex
- Northbound access to Deep Ellum and Baylor Scott & White Hospital Complex
- Southbound access to Downtown Dallas
- Northbound access to Downtown Dallas
- Locations of existing versus proposed entrance ramps to I-345
- Locations of existing versus proposed exit ramps from I-345
STATION 7: PROJECT PARTNERS
At this station, you can:
- Review the City of Dallas design guidance provided to TxDOT during the Feasibility Study, which was carried forward into the I-345 Connects project
- Learn about the working subcommittees that were formed with City of Dallas departments to coordinate on I-345 Connects design elements and view the coordination timeline
- View the various City of Dallas plans and reports and learn how the I-345 Connects project is contributing to the goals and objectives outlined in these plans
STATION 8: GIVE US YOUR FEEDBACK BY APRIL 5, 2024
At this station, you can:
- Find the different ways to offer comments and feedback on the I-345 Connects project
- CLICK HERE TO COMMENT NOW/COMENTARIO AQUI
QUESTIONS?
Contact the TxDOT project manager Grace Lo, P.E. to ask questions about the project at [email protected] or (214) 320-6100.