US 75 from I-635 to SH 121 Public Meeting

Thursday, June 20, 2013

CSJs: 0047-06-145, 0047-07-219

The purpose of the Public Meeting is to present and solicit public input on conceptual alternatives for proposed improvements to US 75 Corridor. The Public Meeting will be conducted in an informal "open house" format. The US 75 Corridor is approximately 21.1 centerline main lane miles. The study addresses long range corridor needs through improvements to transit, arterials, and US 75 mainlane capacity.

Maps, drawings and other information about the project will be on display, showing the location of the study corridor and corridor alternatives. Project personnel will be available to answer questions, discuss possible mobility and environmental effects of the proposed project and to assist in orientation and interpretation of the drawings and other material on hand. This information will also be available for inspection at the TxDOT Dallas District Office (4777 East Highway 80, Mesquite, Texas 75150) and the TxDOT Collin County Area Office (2205 S. State Highway 5, McKinney, TX 75069) and available online at www.US75Mobility.com. Information about the tentative schedules for ROW acquisition and construction may be obtained at the Public Meeting or from the TxDOT offices listed above.

Public Meeting from 5:30 p.m. to 7:30 p.m.

Grand Hall at the Richardson Civic Center,

411 W. Arapaho Road,

Richardson, Texas 75080

Public Meeting Notice