US 80 from I-30 to FM 460 - Public Meeting
Tuesday, March 28, 2017
CSJs: 0095-02-096, 0095-02-107, 0095-03-080, & 0095-10-033
The Texas Department of Transportation (TxDOT) is proposing improvements to US 80 from I-30 to FM 460 in Dallas and Kaufman counties, Texas. Pursuant to Texas Administrative Code, Title 43, Part 1, Chapter 2, Subchapter E, §2.105 and Code of Federal Regulations, Title 23, Chapter I, Subchapter H, §771.111 and Title 40, Chapter V, §1506, this notice advises the public that TxDOT will be conducting a public meeting to discuss and receive public comments on the proposed project. The meeting will be held on Tuesday, March 28, 2017, at North Mesquite High School (cafeteria), 18201 Lyndon B. Johnson Freeway, Mesquite, TX 75150. Representatives from TxDOT and project consultants will be available to answer questions about the proposed project improvements. The meeting will be held in an open house format from 6:00 p.m. to 8:00 p.m. with no formal presentation.
Proposed improvements to US 80 would widen this highway from I-30 in Dallas County to FM 460 in Kaufman County, approximately 11 miles. The proposed improvements include reconstructing and widening the existing four-lane roadway to a six-lane roadway. To accommodate the proposed improvements, ramps, bridge structures, and frontage roads would be reconstructed. Additional right of way is anticipated to be required along US 80.
Public Meeting : 6:00 pm to 8:00 pm (Open House format / no formal presentation)
North Mesquite High School (cafeteria),
18201 Lyndon B. Johnson Freeway,
Mesquite, TX 75150