IH 30 From Bass Pro Drive to West of FM 2642 - Notice of Availability of Final Environmental Assessment and FONSI for Public Review

Wednesday, March 20, 2019

CSJs:0009-11-238, 0009-12-215, 0009-12-219, 0009-12-220

Purpose:

This notice advises the public that a final environmental assessment (EA) is available for public review and the Texas Department of Transportation (TxDOT) has issued a finding of no significant impact (FONSI) for the proposed Interstate Highway (IH) 30 from Bass Pro Drive in Dallas County to west of FM 2642 in Rockwall County, approximately 17 miles through the Cities of Garland, Rowlett, Rockwall, Mobile City, Fate, and Royse City., Dallas and Rockwall Counties, Texas.

Description:

TxDOT is proposing the reconstruction and widening of IH 30 project from Bass Pro Drive in Dallas County to west of FM 2642 in Rockwall County, approximately 17 miles through the Cities of Garland, Rowlett, Rockwall, Mobile City, Fate, and Royse City., Dallas and Rockwall Counties, Texas.

Beginning at Bass Pro to Horizon, the proposed improvements would widen this existing section of the roadway to accommodate adding shoulders along the existing 4 mainlanes (currently 3 lanes and one auxiliary lane in each direction). From Dalrock Road to SH 205, the proposed improvements would reconstruct and widen this section from six mainlanes (3 lanes in each direction) to eight mainlanes (4 lanes in each direction), and would reconstruct the four discontinuous frontage roads (2 lanes in each direction) to six-lane continuous frontage roads (3 lanes in each direction), to include bicycle and pedestrian accommodations crossing Lake Ray Hubbard. From SH 205 to West of FM 2642 (Hunt County Line), the proposed improvements would reconstruct and widen this section from four mainlanes (2 lanes in each direction) to six mainlanes (3 lanes in each direction), and would reconstruct the existing four lane frontage roads (two lanes in each direction). Other improvements for this project include the reconstruction of interchanges at Horizon Road, FM 548, and FM 35, construction of new interchanges at Ben Payne Road / Rochelle Road, Blackland Road, and Floyd Road (future Outer Loop), and associated ramp modifications

Memorandum of Understanding:

The environmental review, consultation, and other actions required by applicable federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 16, 2014, and executed by FHWA and TxDOT.

Downloads:

Notice of Availability of Final EA and FONSI Document
Final Environmental Assessment
FONSI Document