Notice of Scoping Public Meeting For the Loop 9, Segment A Project From US 67 To IH 35E
CSJs: 2964-10-006 and 0261-01-041
Purpose
To present the project studies completed to date and identify relevant issues related to the proposed Loop 9, Segment A project as part of the National Environmental Policy Act (NEPA) process. This public scoping meeting will provide an opportunity for the public to review and comment on the draft Project Coordination Plan, the project purpose and need, and the range of alternatives developed to date to be considered and evaluated in the Environmental Impact Statement (EIS).
Description
The proposed Loop 9, Segment A project is an approximately 9.4-mile proposed new location six-lane roadway within an approximate 600-foot right-of-way. The proposed project right-of-way would include a median that would accommodate the future construction of an ultimate access-controlled mainlane facility. A No-Build Alternative and refined Build Alternatives (Alternative 1, Alternative 2, and Alternative 3–based on prior public involvement) are being examined.
Special accommodations
TxDOT makes every reasonable effort to accommodate the needs of the public. The open house and hearing will be conducted in English. If you have a special communication accommodation or need for an interpreter, a request can be made. If you have a disability and need assistance, special arrangements can also be made to accommodate most needs. Please call the TxDOT Dallas District Public Information Office at (214) 320-4480 at least two working days prior to the meeting. Please be aware that advance notice is requested as some accommodations may require time for TxDOT to arrange.
MOU NEPA Assignment
The environmental review, consultation and other actions required by applicable federal environmental laws for this project are being, or have been carried-out by TxDOT pursuant to 23 U.S.C 327 and a Memorandum of Understanding dated December 16, 2014, and executed by the Federal Highway Administration and TxDOT.
When
Thursday, July 11, 2019
Open House Format from 6:00 p.m. to 8:00 p.m. (no formal presentation).
Where
Cedar Hill Recreational Center
Texas Room
310 East Parkerville Road
Cedar Hill, Texas 75104
Notice of Scoping Public Meeting (English)
Notice of Scoping Public Meeting (Spanish)
Project Venue Map
NOI Federal Register Publication
0777_061219_Loop 9 Corridor A_SUMMER-Q2-2019_white paper
2964-10-006; 0261-01-041 Loop 9_Project Coordination Plan_PIP_06-02-2019
2964-10-006; 0261-01-041 LP 9-Seg A_Purpose & Need Statement_DRAFT_04-19-2019
2964-10-006 etc. LP 9-Seg A_PP Presentation Handout_Red Oak_07-09-19
2964-10-006 etc. LP 9-Seg A_PP Presentation_Red Oak_07-09-19
2964-10-006 etc. LP 9-Seg A_PP Presentation Handout_Cedar Hill_07-11-19
2964-10-006 etc. LP 9-Seg A_PP Presentation_Cedar Hill_07-11-19
2964-10-002 1-4 LP9 Corr-Feas Study Rprt FINAL Vol I March 2014
2964-10-002 1-4 LP9 Corr-Feas Study Appdcs FINAL Vol II March 2014
August 8, 2019 LOO9 9, SEGMENT A PROJECT AGENCY SCOPING MEETING MATERIALS