Notice of Scoping Public Meeting For the Loop 9, Segment A Project From US 67 To IH 35E

Tuesday, July 09, 2019

CSJs: 2964-10-006 and 0261-01-041

Purpose

To present the project studies completed to date and identify relevant issues related to the proposed Loop 9, Segment A project as part of the National Environmental Policy Act (NEPA) process.  This public scoping meeting will provide an opportunity for the public to review and comment on the draft Project Coordination Plan, the project purpose and need, and the range of alternatives developed to date to be considered and evaluated in the Environmental Impact Statement (EIS).

Description

The proposed Loop 9, Segment A project is an approximately 9.4-mile proposed new location six-lane roadway within an approximate 600-foot right-of-way. The proposed project right-of-way would include a median that would accommodate the future construction of an ultimate access-controlled mainlane facility. A No-Build Alternative and refined Build Alternatives (Alternative 1, Alternative 2, and Alternative 3–based on prior public involvement) are being examined.

Special accommodations

TxDOT makes every reasonable effort to accommodate the needs of the public. The open house and hearing will be conducted in English. If you have a special communication accommodation or need for an interpreter, a request can be made. If you have a disability and need assistance, special arrangements can also be made to accommodate most needs. Please call the TxDOT Dallas District Public Information Office at (214) 320-4480 at least two working days prior to the meeting. Please be aware that advance notice is requested as some accommodations may require time for TxDOT to arrange.

MOU NEPA Assignment

The environmental review, consultation and other actions required by applicable federal environmental laws for this project are being, or have been carried-out by TxDOT pursuant to 23 U.S.C 327 and a Memorandum of Understanding dated December 16, 2014, and executed by the Federal Highway Administration and TxDOT. 

When

Tuesday, July 9, 2019
Open House Format from 6:00 p.m. to 8:00 p.m. (no formal presentation).

Where

Red Oak Municipal Center
Reagan and Pitts Room
200 Lakeview Parkway
Red Oak, Texas 75154

Notice of Scoping Public Meeting (English)
Notice of Scoping Public Meeting (Spanish)
Project Venue Map
NOI Federal Register Publication

0777_061219_Loop 9 Corridor A_SUMMER-Q2-2019_white paper
2964-10-006; 0261-01-041 Loop 9_Project Coordination Plan_PIP_06-02-2019
2964-10-006; 0261-01-041 LP 9-Seg A_Purpose & Need Statement_DRAFT_04-19-2019
2964-10-006 etc. LP 9-Seg A_PP Presentation Handout_Red Oak_07-09-19
2964-10-006 etc. LP 9-Seg A_PP Presentation_Red Oak_07-09-19
2964-10-006 etc. LP 9-Seg A_PP Presentation Handout_Cedar Hill_07-11-19
2964-10-006 etc. LP 9-Seg A_PP Presentation_Cedar Hill_07-11-19
2964-10-002 1-4 LP9 Corr-Feas Study Rprt FINAL Vol I March 2014
2964-10-002 1-4 LP9 Corr-Feas Study Appdcs FINAL Vol II March 2014

August 8, 2019 LOO9 9, SEGMENT A PROJECT AGENCY SCOPING MEETING MATERIALS