US 67 at Lake Ridge Parkway Project Dallas and Ellis Counties - Public Meeting

Thursday, January 23, 2020

CSJs: 0261-01-041

Purpose:

The Texas Department of Transportation (TxDOT) Dallas District is conducting a public meeting to solicit comments on the proposed construction of a grade separation (Phase I – interim) for United States Highway (US) 67 at Lake Ridge Parkway, in Dallas and Ellis Counties, Texas. The length of the proposed project is approximately 1.9 miles.

Description:

The proposed project improvements would consist of the construction of a grade-separated interchange at Lake Ridge Parkway with an overpass at US 67, and would include six 12-foot lanes (three in each direction), 10-foot raised median, curb and gutter, and Texas U-turns.  The existing ramps within the project area would be converted to an X-ramp pattern design for Lake Ridge Parkway. The proposed improvements would also include reconstruction of US 67 mainlanes and frontage roads, from north of Shiloh Road to south of Mt. Lebanon Road. The proposed US 67 mainlanes would consist of four 12-foot lanes (two in each direction), 22-foot inside shoulder, and 10- foot outside shoulders. 26-foot wide inside grassy median separates the northbound and southbound mainlanes. The 22-foot inside shoulder would be restriped in the future to add one additional travel lane in each direction.  The proposed northbound and southbound frontage roads would consist of two 12-foot lanes and 8-foot inside and outside shoulders. The purpose of the proposed project is to reduce traffic congestion, enhance connectivity, and improve mobility and safety.

Special accommodations:

TxDOT makes every reasonable effort to accommodate the needs of the public. The meeting is an open house format and will be conducted in English. If you have a special communication accommodation or need for an interpreter, a request can be made. If you have a disability and need assistance, special arrangements can also be made to accommodate most needs. Please call the TxDOT Dallas District Public Information Office at (214) 320-4480 at least two working days prior to the meeting. Please be aware that advance notice is requested as some accommodations may require time for TxDOT to arrange.

MOU NEPA Assignment:

The environmental review, consultation and other actions required by applicable federal environmental laws for this project are being, or have been carried-out by TxDOT pursuant to 23 U.S.C 327 and a Memorandum of Understanding dated December 16, 2014, and executed by the Federal Highway Administration and TxDOT.

Where:

The Alan E. Sims Cedar Hill Recreation Center

310 E Parkerville Rd,

Cedar Hill, TX 75104.

When:

Thursday, January 23, 2020

Open House Format Only

from 6:00 p.m. to 8:00 p.m.

Notice of Public Meeting

Notice of Public Meeting (Spanish)

Venue Map