Notice of Availability of Draft Environmental Impact Statement (EIS) and Public Hearing for Spur 399 Extension from US 75 to US 380 in Collin County
Friday, October 7, 2022
CSJ: 2979-01-011
Where and When:
The draft EIS is available and a virtual public hearing will be held at www.keepitmovingdallas.com/Spur399. The virtual hearing is not a live event and can be viewed at any time beginning at 5:30 p.m. on Thursday, November 10, 2022 and will remain available online through 11:59 p.m. on Saturday, December 10, 2022.
An in-person public hearing will be held in an open house format where the public may come and go at their convenience. The in-person hearing will be held on Thursday, November 10 from 5:30 p.m. to 7:30 p.m. at Sheraton Hotel Throckmorton Ballroom, 1900 Gateway Blvd, McKinney, TX 75070.
Materials presented at the virtual public hearing and in-person public hearing will be identical.
All comments must be received on or before December 10, 2022.
Description:
The Texas Department of Transportation (TxDOT) is proposing to construct an extension to Spur 399 from US 75 south of McKinney to US 380 east of McKinney in Collin County. The proposed project would accommodate a six to eight-lane freeway with frontage roads on each side in most areas to improve north-south mobility and improve connectivity between the eastern portion of Collin County and destinations south of McKinney. The typical proposed right-of-way (ROW) would be approximately 400 feet wide, with the minimum and maximum ROW width ranging from 165 feet to 696 feet, respectively. Depending on the location, the typical freeway section would consist of four 12-foot-wide travel lanes in each direction with 10 to 17 foot wide inside and outside shoulders and 2 lane (each 12-feet-wide), one-way frontage roads on either side of the mainlanes. Shared-use paths built along the outside of the frontage roads would provide bicycle and pedestrian accommodations and support multi-modal access. The total proposed ROW acreage is estimated at 366.1 acres. The proposed project passes through the City of McKinney and College County and is near the town of Fairview.
Special Accommodations:
The virtual public meetings and in-person options will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or are a person with a disability who requires an accommodation to attend and participate in the virtual public meeting or in-person option, please contact the TxDOT Dallas District Public Information Officer at (214) 320-4480 no later than 4 p.m., Monday, November 7, 2022. Please be aware that advance notice is required as some services and accommodations may require time for TxDOT to arrange.
Memorandum of Understanding:
The environmental review, consultation, and other actions required by applicable federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 9, 2019, and executed by FHWA and TxDOT.
Downloads:
Notice (English)
Venue Map (English)
Notice (Spanish)
Venue Map (Spanish)
Notice (Vietnamese)
Venue Map (Vietnamese)
Contact:
TxDOT Dallas District
Public Information Office
(214) 320-4480