Loop 9 Southeast Corridor/Feasibility Study - Public Meeting
CSJ: 2964-10-002
The Texas Department of Transportation (TxDOT) will conduct two Public Meetings for the purpose of soliciting public comment on the proposed phasing of improvements to Loop 9 from United States (US) Highway 67 to Interstate Highway 20 (I-20) within Ellis, Dallas, and Kaufman Counties. The corridor is approximately 35 miles in length. A new location roadway is proposed with possible toll applications being applied. The intent of the Loop 9 Southeast Corridor/Feasibility Study is to develop a locally-preferred alignment that would improve transportation efficiency within Dallas, Ellis and Kaufman Counties. Identical information will be presented at both meetings.
Maps, drawings, and other information about the project will be on display, showing the location of the study corridor and corridor alternatives. Project personnel will be available to discuss possible mobility and environmental effects of the proposed project and to assist in orientation and interpretation of the drawings and other material on hand. Project information is also available online at http://www.loop9.org .
Open House: 5:30 p.m. to 6:30 p.m.
Presentation: 6:30 p.m. to 7:00 p.m.
Open House: 7:00 p.m. to 8:00 p.m.
Lancaster Elementary School
1109 West Main Street
Lancaster, TX 75146